---
title: "Curtiss-Wright: How Curtiss-Wright Accelerated Production Orders"
---

[![CONTROLTEK](https://content.controltekusa.com/hs-fs/hubfs/controlttek_slogan-new-min-1-300x74-1.png?width=300&height=74&name=controlttek_slogan-new-min-1-300x74-1.png "CONTROLTEK")](https://www.controltekusa.com/)

![Curtiss-Wright](https://content.controltekusa.com/hs-fs/hubfs/Curtiss-Wright.png?width=1545&height=2000&name=Curtiss-Wright.png "Curtiss-Wright")

Case Study

Curtiss-Wright

## From 7 Days to 24 Hours: How Curtiss-Wright Accelerated Production Orders

### What’s Inside?

**Real-Time Visibility for Smarter Manufacturing Operations**

See how Curtiss-Wright transformed its valve assembly operations by implementing RFID-enabled work-in-process tracking, gaining real-time visibility into production orders and material flow across the facility.

**Highlights:**

- **Challenges Solved:** Explore how Curtiss-Wright addressed limited WIP visibility, long production lead times driven by complex part variations, reliance on institutional knowledge, and inefficiencies caused by manual searching and bottlenecks.
- **Efficient Solutions:** Learn how RFID labels, sitewide readers, and real-time operational dashboards automated WIP tracking, surfaced aging and expedited orders, and integrated seamlessly with existing data and reporting tools.
- **Impressive Results:** Discover how Curtiss-Wright reduced order processing times from seven days to 24 hours, cut WIP inventory by 90%, improved operational efficiency, and enabled more proactive, data-driven decision-making.

### Send Me the Case Study

Copyright © 2026 CONTROLTEK. All Rights Reserved.